Finished baling on Friday (slough hay)
Did some cow checking and pulled a bull on Saturday
Cement truck came today
New scale pad
New footing on a 1917 barb
Got home from school just in time to have the driver show him how the truck works
We poured a nice level water trough pad (last photo). I ordered about 4.5 yards, but the truck came loaded with 6 so we had to get a bit creative. Filled a tire trough, cemented around a well, and put some nice sloped sides on the scale and water trough pads.

Did some cow checking and pulled a bull on Saturday

Cement truck came today

New scale pad

New footing on a 1917 barb

Got home from school just in time to have the driver show him how the truck works

We poured a nice level water trough pad (last photo). I ordered about 4.5 yards, but the truck came loaded with 6 so we had to get a bit creative. Filled a tire trough, cemented around a well, and put some nice sloped sides on the scale and water trough pads.